[1]
Warka, I.G.P. et al. 2017. PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG J (IRMA UTAMA) RSU PROVINSI NTB MENGGUNAKAN METODE EARNED VALUE: Cost and Time Control on Construction Project of NTB Province Public Hospital’s J Building (Irna Utama) using Earned Value Method. Spektrum Sipil. 2, 2 (Aug. 2017), 125–136.