[1]
Mawardin, A. et al. 2023. ANALISA EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN BENDUNGAN (STUDI KASUS PEMBANGUNAN BENDUNGAN BERINGIN SILA PAKET II): Earned Value Analysis of Cost and Time on Dam Construction Projects (Case Study of The Construction of The Beringin Sila Package II). Spektrum Sipil. 10, 2 (Oct. 2023), 98–108. DOI:https://doi.org/10.29303/spektrum.v10i2.242.