[1]
Akbari, G.Z. et al. 2025. EVALUASI DEBIT PUNCAK BANJIR RANCANGAN DENGAN METODE WEDUWEN, HASPERS, MELCHIOR, NAKAYASU DAN GAMA 1 PADA DAS CABANG: Evaluation of Design Flood Peak Discharge using the Weduwen, Haspers, Melchior, Nakayasu and Gama-1 Methods in Cabang Watershed. Spektrum Sipil. 12, 2 (Oct. 2025), 143–154. DOI:https://doi.org/10.29303/spektrum.v12i2.391.