(1)
Fardila, D.; Sugian, A. ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI BETON READY MIX DENGAN MENGGUNAKAN METODE ACTIVITY BASED COSTING (ABC): Analysis Calculation of the Cost of Production of Ready Mix Concrete Using the Activity Base Costing (ABC) Method. SS 2023, 10, 81-87.