Aminullah, A., Setiawan, A., & Warka, I. G. P. (2020). ANALISIS KETERLAMBATAN PROYEK KONSTRUKSI PADA PROYEK PLTMH KOKOQ BABAK BATUKLIANG UTARA KABUPATEN LOMBOK TENGAH: Analysis of Construction Project Delays at PLTMH Kokoq Babak Batukliang Utara Central Lombok District. Spektrum Sipil, 6(2), 106–116. https://doi.org/10.29303/spektrum.v6i2.152