MAWARDIN, Adi; HASMARITA, Hasmarita; FARDILA, Dinda. ANALISA EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN BENDUNGAN (STUDI KASUS PEMBANGUNAN BENDUNGAN BERINGIN SILA PAKET II): Earned Value Analysis of Cost and Time on Dam Construction Projects (Case Study of The Construction of The Beringin Sila Package II). Spektrum Sipil, [S. l.], v. 10, n. 2, p. 98–108, 2023. DOI: 10.29303/spektrum.v10i2.242. Disponível em: https://spektrum.unram.ac.id/index.php/Spektrum/article/view/242. Acesso em: 21 nov. 2024.