Warka, I. G. P., Handayani, T. and Asmina, D. (2017) “PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG J (IRMA UTAMA) RSU PROVINSI NTB MENGGUNAKAN METODE EARNED VALUE: Cost and Time Control on Construction Project of NTB Province Public Hospital’s J Building (Irna Utama) using Earned Value Method”, Spektrum Sipil, 2(2), pp. 125–136. Available at: https://spektrum.unram.ac.id/index.php/Spektrum/article/view/28 (Accessed: 22 December 2024).