[1]
I. G. P. Warka, T. Handayani, and D. Asmina, “PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG J (IRMA UTAMA) RSU PROVINSI NTB MENGGUNAKAN METODE EARNED VALUE: Cost and Time Control on Construction Project of NTB Province Public Hospital’s J Building (Irna Utama) using Earned Value Method”, SS, vol. 2, no. 2, pp. 125–136, Aug. 2017.