[1]
A. Mawardin, H. Hasmarita, and D. Fardila, “ANALISA EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN BENDUNGAN (STUDI KASUS PEMBANGUNAN BENDUNGAN BERINGIN SILA PAKET II): Earned Value Analysis of Cost and Time on Dam Construction Projects (Case Study of The Construction of The Beringin Sila Package II)”, SS, vol. 10, no. 2, pp. 98–108, Oct. 2023.