Mawardin, Adi, Hasmarita Hasmarita, and Dinda Fardila. “ANALISA EARNED VALUE TERHADAP BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN BENDUNGAN (STUDI KASUS PEMBANGUNAN BENDUNGAN BERINGIN SILA PAKET II): Earned Value Analysis of Cost and Time on Dam Construction Projects (Case Study of The Construction of The Beringin Sila Package II)”. Spektrum Sipil 10, no. 2 (October 1, 2023): 98–108. Accessed November 21, 2024. https://spektrum.unram.ac.id/index.php/Spektrum/article/view/242.