Sari, Oryza Lhara, Raftonado Situmorang, and Nadia Septiana. “PENANGANAN FAKTOR PENYEBAB WASTE DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PEMBANGUNAN JEMBATAN SEI ALALAK BANJARMASIN): Handling the Factors That Cause Waste by Using the Lean Construction Approach (Case Study: Sei Alalak Bridge Construction Banjarmasin)”. Spektrum Sipil 10, no. 2 (November 15, 2023): 147–152. Accessed November 23, 2024. https://spektrum.unram.ac.id/index.php/Spektrum/article/view/271.