PENANGANAN FAKTOR PENYEBAB WASTE DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PEMBANGUNAN JEMBATAN SEI ALALAK BANJARMASIN)

Handling the Factors that Cause Waste by using the Lean Construction Approach (Case Study: Sei Alalak Bridge Construction Banjarmasin)

Authors

Oryza Lhara Sari , Raftonado Situmorang , Nadia Septiana

DOI:

10.29303/spektrum.v10i2.271

Published:

2023-11-15

Issue:

Vol. 10 No. 2 (2023): SPEKTRUM SIPIL

Keywords:

Jembatan Sei Alalak, Lean construction, Waste

Articles

Downloads

How to Cite

Sari, O. L., Situmorang, R., & Septiana, N. (2023). PENANGANAN FAKTOR PENYEBAB WASTE DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PEMBANGUNAN JEMBATAN SEI ALALAK BANJARMASIN): Handling the Factors that Cause Waste by using the Lean Construction Approach (Case Study: Sei Alalak Bridge Construction Banjarmasin). Spektrum Sipil, 10(2), 147–152. https://doi.org/10.29303/spektrum.v10i2.271

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Abstract

Lean Construction atau konstruksi ramping merupakan sebuah metode yang beberapa tahun terakhir digunakan para penyedia jasa konstruksi untuk meminimalkan waste yang terjadi dengan tujuan meningkatkan nilai tambah (value). Dari hasil identifikasi sebelumnya pada proyek Pembangunan Jembatan Sei Alalak Banjarmasin, terdapat 3 faktor penyebab waste yang paling berpengaruh yaitu: cuaca buruk, pengawasan pembuatan beton mulai dari penimbangan berat material hingga batching plan, dan dokumen pengujian. Untuk mengetahui penanganan waste tersebut, maka digunakan beberapa tools yang ada pada lean construction dengan menyebarkan kuisioner kepada para ahli (expert). Dengan menggunakan tools yang ada pada lean construction maka strategi penanganan yang didapatkan yaitu 1. cuaca tidak mendukung: last planner system, increased visualization, first run studies, daily huddle meeting; 2. pengawasan pembuatan beton mulai dari penimbangan berat material sampai dengan batching plant: last planner system, daily huddle meeting, fail-safe quality and safety; 3. dokumen pengujian: last planner system, increased visualization, daily huddle meeting, 5S process.

Author Biographies

Oryza Lhara Sari, Institut Teknologi Kalimantan

Raftonado Situmorang, Institut Teknologi Kalimantan

Nadia Septiana, Institut Teknologi Kalimantan

License

Copyright (c) 2023 Oryza Lhara Sari, Raftonado Situmorang, Nadia Septiana

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

You are free to:

  • Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
  • Adapt — remix, transform, and build upon the material for any purpose, even commercially.

The licensor cannot revoke these freedoms as long as you follow the license terms.

Under the following terms:

  • Attribution — You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.

Notices:

You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation.

No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.

Similar Articles

1 2 3 > >> 

You may also start an advanced similarity search for this article.