ANALISIS KETERLAMBATAN PEMBANGUNAN SARANA AIR MINUM DAN SANITASI BERBASIS MASYARAKAT PADA PROGRAM PAMSIMAS III TAHUN 2021 DI KABUPATEN LOMBOK TENGAH

Analysis of Delays in the Construction of Local Community-Based Water Supply and Sanitation Facilities of 2021 PAMSINAS III Program in Central Lombok Regency

Authors

Dani Anggara , Suryawan Murtiadi , Muhajirah Muhajirah

DOI:

10.29303/spektrum.v9i2.261

Published:

2022-09-28

Issue:

Vol. 9 No. 2 (2022): SPEKTRUM SIPIL

Keywords:

Keterlambatan, Air minum, Sanitasi, CPM, FTA

Articles

Downloads

How to Cite

Anggara, D., Murtiadi, S., & Muhajirah, M. (2022). ANALISIS KETERLAMBATAN PEMBANGUNAN SARANA AIR MINUM DAN SANITASI BERBASIS MASYARAKAT PADA PROGRAM PAMSIMAS III TAHUN 2021 DI KABUPATEN LOMBOK TENGAH: Analysis of Delays in the Construction of Local Community-Based Water Supply and Sanitation Facilities of 2021 PAMSINAS III Program in Central Lombok Regency. Spektrum Sipil, 9(2), 133–142. https://doi.org/10.29303/spektrum.v9i2.261

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Abstract

Keterlambatan proyek bisa terjadi di setiap proyek, termasuk pada pembangunan air minum dan sanitasi berbasis masyarakat pada Program PAMSIMAS III Kabupaten Lombok Tengah Tahun 2021. Penelitian ini bertujuan untuk mengetahui faktor yang menyebabkan keterlambatan, mengetahui faktor yang paling berpengaruh pada keterlambatan proyek, dan memberikan solusi yang tepat untuk mengatasi keterlambatan sehingga dapat menjadi bahan evaluasi agar tidak terjadi keterlambatan pada proyek selanjutnya. Penelitian ini menggunakan metode Critical Path Method (CPM) dan Fault Tree Analysis (FTA) sebagai metodologi penelitian dan menggunakan sumber-sumber yang terkait sebagai dasar teori yang digunakan. Hasil analisis menggunakan metode CPM, diperoleh jalur kritis pada Jalur 1 yang terdiri dari kegiatan C-B-A-K yaitu pekerjaan Tower Reservoir, Listrik, Pompa, dan Uji Kualitas Air. Hasil analisis menggunakan metode FTA diketahui penyebab utama keterlambatan yaitu dari “gangguan selama proses pembangunan†dengan probabilitas kejadian 76,81%. Sedangkan penyebab utama terjadinya kejadian tersebut yaitu dari kejadian “tukang atau pekerja terbatas†probabilitas kejadian 14,29%.

Author Biographies

Dani Anggara, BWS NT1

Suryawan Murtiadi, Universitas Mataram

Muhajirah Muhajirah, Universitas Mataram

License

Copyright (c) 2022 Dani Anggara, Suryawan Murtiadi, Muhajirah Muhajirah

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

You are free to:

  • Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
  • Adapt — remix, transform, and build upon the material for any purpose, even commercially.

The licensor cannot revoke these freedoms as long as you follow the license terms.

Under the following terms:

  • Attribution — You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.

Notices:

You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation.

No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

<< < 2 3 4 5 6 7 8 > >> 

You may also start an advanced similarity search for this article.