https://www.disctalent.com/contact
sarang288 link alternatif
ketua288
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
slot gacor
Link Resmi Situs Toto Slot Gacor 4D
slot
slot gacor
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
mahjong
Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Home
About the Journal
Current
Archives
Announcements
Editorial Team
Submissions
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 6 No. 1 (2019): SPEKTRUM SIPIL
Vol. 6 No. 1 (2019): SPEKTRUM SIPIL
DOI:
https://doi.org/10.29303/spektrum.v6i1
Published:
04/21/2020
Articles
MODIFIKASI STRUKTUR GEDUNG KONDOMINIUM HOTEL AMARSVATI LOMBOK DENGAN BALOK PRATEGANG
Structure Modification of Condominium Hotel Amarsvati Lombok with Prestressed Beam
Nurul Auliyanti, Pathurahman Pathurahman, Suryawan Murtiadi
1 - 13
PDF (Bahasa Indonesia)
ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PERMINTAAN JASA OJEK ONLINE DI KOTA MATARAM
Analysis of Factors Affecting the Demand of Online Motorbike Taxi Service in Mataram
Yogie Prakasa, Rohani Rohani, Hasyim Hasyim
14 - 22
PDF
PENGARUH PERKUATAN GEOTEKSTIL TIPE WOVEN GX-50 TERHADAP KERUNTUHAN PONDASI PADA PASIR PANTAI DENGAN VARIASI KEDALAMAN MUKA AIR
The Effect of Geotextile GX-50 Woven Type Reinforcement to the Failure of Foundation on the Sand Marine
Baiq Tami Dwi Adinda, Agung Prabowo, Ismail Hoesain Muchtaranda
23 - 31
PDF (Bahasa Indonesia)
EVALUASI KAPASITAS TAMPUNGAN EMBUNG BISOK BOKAH
Capacity Evaluation of Bisok Bokah Small Dam
Gusman Rosyadi, Humairo Saidah, M Bagus Budianto
32 - 44
PDF (Bahasa Indonesia)
PERENCANAAN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONSTRUKSI DENGAN TINGKAT RESIKO TINGGI (STUDI PADA PROYEK ROYAL AVILLA MALIMBU)
Safety and Health Planning (K3) in High Risk Levels Construction Project (Study on Royal Avilla Malimbu Project)
Aditiya Gerhan, Zaedar Gazalba
45 - 55
PDF (Bahasa Indonesia)
PERENCANAAN DAN PENGELOLAAN TPS 3R DI KELURAHAN KARANG PULE
Planning and 3R Waste Management in Karang Pule Village
Krisnanda Faundra Putra, Lalu Wirahman W, Agustono Setiawan
56 - 68
PDF (Bahasa Indonesia)
ANALISIS MODULUS GESER MAKSIMUM TANAH LEMPUNG EKSPANSIF DENGAN PERKUATAN SERAT IJUK BERDASARKAN METODE EMPIRIS
Analysis of Maximum Shear Modulus Expansive Clays With Strengthening Fibers Based on Empirical Method
Linawati Linawati, Tri Sulistyowati, Ismail Hoesain Muchtaranda
69 - 78
PDF (Bahasa Indonesia)
MAIN MENU
Focus and Scope
Author Guidelines
Editorial Board
Reviewer
Publication Ethics
Plagiarism Check
Publication Fees
akreditasi
submit
visitor
Visitor Counter
`
View My Stats
>
issn
ISSN
p-ISSN : 1858-4896
e-ISSN : 2581-2505